setting up a minimum will limit some teams who are willing to help but will have little. kupeza ndikosiyana siyana. 10,000 is 4 bags of cement. Team itabweletsa cement ameneyi saagwila ntchito?
--- On Wed, 23/6/10, Daud Suleman <[email protected]> wrote: From: Daud Suleman <[email protected]> Subject: Re: {CEZOBAL} REHABILITATION OF SILVER BASKETBALL COURT: On pledges To: [email protected] Date: Wednesday, 23 June, 2010, 11:24 Guys, i know we all mean well but i think we should not restrict ourselves when pledging towards our own infrastructure. Can we say members should contribute and not teams? if teams want to contribute,then lets work out a minimum that a team can pledge, other wise 10,000 from a team is a joke! some teams have members who can easily afford to donate 5,000 each to the cause, making a minimum of 50,000 per team! we will only need 6 teams to do everything at Silver. Lets rise above our teams and make a positive contribution to the game as an individual, the team will alwys be there. We need 30 players to give 5,000 each to get this court done, seriously cant we get 30 people to give 5,000 each??? good day. sule. On Wed, Jun 23, 2010 at 10:17 AM, wales mvula <[email protected]> wrote: Sirs, I had a suggestion on point no4. Could we add replacement of the rings if possible because those rims are also a causer of the awkard bounces. Maybe some1 has the same rims as za ku outdoor ya ABC that he doesnt use. Actually I saw some old ones kuseli kwa ABC gym just rotting there (kaya alipobe). Kodi ABC simungapangeko pledge ma ring amene aja abale. Disciples nafe tikukambila pa nkhani ya ma pledge. pa 5 mpatali Zikomo che-welo CEZOBAL FAMILY, Please be advised that the CEZOBAL Executive Committee will be carrying out some rehabilitation work on Silver Stadium during the Mid-Season break to try and improve the standard of the Silver basketball court. CEZOBAL is a big family and if we were to come together and help each other in this initiative it will benefit all of us and the generations to come. I have listed below materials which will be needed to help with the rehabilitation of the court. Those of you who feel they can assist with some materials listed below please contact me on 099 9919 328 and we will make arrangements on when the materials you would like to assist with will be needed. The following are the works which we plan to carry out using the listed materials below:- 1. Reworking and plastering the existing 3 stands. 2. Building an additional 2 stands on top of the existing 3 stands and plaster them as well. The extra 2 stands are to act as protective cover for all the water and sand which move from higher ground onto the existing stands as well as the playing surface. 3. Drainage for the water which comes from the high ground 4. The boards will be reworked and block board will be put on the front of the hoops so as to avoid the ball bouncing off the board in an awkward way. The block boards will be painted 3 coats of oil paint so as to protect them to last a long time. 5. Resurfacing the cracked areas around the playing area, and painting most of the playing area with different colours. ITEM UNIT QUANTITY ESTIMATED UNIT RATE TOTATL COST Cement Bags 50 MK2,700 MK135,000 Sand Trips 5 MK12,000 MK60,000 Quarry Stone Trips 3 MK15,000 MK45,000 Bricks Trips 1 MK30,000 MK30,000 Paint 5 Litre tins 6 -- http://soyapi.com/owinna/cezobal2008 =================================== You received this message because you are subscribed to the Google Groups "Central Zone Basketball League" group. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [email protected] For more options, visit this group at http://groups.google.com/group/cezobal?hl=en