A possible option to have it run without taking over the machine would be
to run the send inside a cfthread with a low priority.

Otherwise it does sound like a memory issue.

Byron Mann
Lead Engineer and Architect
Hostmysite.com
On Jan 25, 2012 6:13 PM, "Jennifer Lehmann" <[email protected]> wrote:

>
> > I have a scheduled task that generates over 5,000 email.  It runs at
> > 10:00 PM CST and in CF8 ran without error.
> >
> > In CF9 it runs the memory up and crashes after 20 minutes into the
> > task.
> >
> > CF8 server is Windows 2003 with CF8 32 bit
> > CF9 server is Windows 2008 R2 with CF9 64 bit
> >
> > I can't keep the CF8 servers up to run this task so how can I get it
> > working in CF9?
> >
> > I can send the code, it is lengthy, but what would do this in CF8 but
> > blow up in CF9.
>
> CF8 is installed in a Stand Alone configuration with 1 GB memory for
> everything on the server.  CF9 is in instances and the scheduled task is
> running within that 1 GB space.  So I should allow 2GB of RAM for the CF9
> instance?
>
> 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|
Order the Adobe Coldfusion Anthology now!
http://www.amazon.com/Adobe-Coldfusion-Anthology/dp/1430272155/?tag=houseoffusion
Archive: 
http://www.houseoffusion.com/groups/cf-server/message.cfm/messageid:6981
Subscription: http://www.houseoffusion.com/groups/cf-server/subscribe.cfm
Unsubscribe: http://www.houseoffusion.com/groups/cf-server/unsubscribe.cfm

Reply via email to