A possible option to have it run without taking over the machine would be to run the send inside a cfthread with a low priority.
Otherwise it does sound like a memory issue. Byron Mann Lead Engineer and Architect Hostmysite.com On Jan 25, 2012 6:13 PM, "Jennifer Lehmann" <[email protected]> wrote: > > > I have a scheduled task that generates over 5,000 email. It runs at > > 10:00 PM CST and in CF8 ran without error. > > > > In CF9 it runs the memory up and crashes after 20 minutes into the > > task. > > > > CF8 server is Windows 2003 with CF8 32 bit > > CF9 server is Windows 2008 R2 with CF9 64 bit > > > > I can't keep the CF8 servers up to run this task so how can I get it > > working in CF9? > > > > I can send the code, it is lengthy, but what would do this in CF8 but > > blow up in CF9. > > CF8 is installed in a Stand Alone configuration with 1 GB memory for > everything on the server. CF9 is in instances and the scheduled task is > running within that 1 GB space. So I should allow 2GB of RAM for the CF9 > instance? > > ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~| Order the Adobe Coldfusion Anthology now! http://www.amazon.com/Adobe-Coldfusion-Anthology/dp/1430272155/?tag=houseoffusion Archive: http://www.houseoffusion.com/groups/cf-server/message.cfm/messageid:6981 Subscription: http://www.houseoffusion.com/groups/cf-server/subscribe.cfm Unsubscribe: http://www.houseoffusion.com/groups/cf-server/unsubscribe.cfm
