Hello everyone, Now that the Rhino's fund raiser is behind us it is time to focus back on the NOC. Therefore this week's Saturday meeting will be a workday beginning at 10:00am. Priority #1 will be to finish framing in the windows and applying insulation! With daily temperatures near 100 degrees Fahrenheit this task must be taken care of immediately. The only material still needed is approximately 2 or 3 sheets of medium thickness plywood or something similar. I will make arrangements to pick this up in the morning and have it at Judy Bug's by 10am. Non-itchy cellulose insulation has been purchased so all the fiberglass weenies can still join in and remain itch free. Be prepared to sweat sweat sweat. It is hot in the NOC. Most of the tools needed are already available at the NOC but if anyone has a kick ass circular saw then please bring it. We have a table saw but cutting plywood sheets may be easier with a handheld saw.
Here is what we need to do: Cut 2x4's for windows Drill and install anchors Mount 2x4's Cut plywood for windows Mount plywood Fill gaps with GreatStuff Fill window boxes with inuslation Close up top of windows Enjoy reduction in temperature. Thanks to bandwith we now have a water cooler upstairs so cold water will be available to fight off dehydration. See you Saturday, Tom --~--~---------~--~----~------------~-------~--~----~ You received this message because you are subscribed to the Google Groups "CHAOS706.ORG" group. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [EMAIL PROTECTED] For more options, visit this group at http://groups.google.com/group/chaos706 -~----------~----~----~----~------~----~------~--~---
