Hello everyone,

Now that the Rhino's fund raiser is behind us it is time to focus back
on the NOC.  Therefore this week's Saturday meeting will be a workday
beginning at 10:00am.  Priority #1 will be to finish framing in the
windows and applying insulation!  With daily temperatures near 100
degrees Fahrenheit this task must be taken care of immediately.  The
only material still needed is approximately 2 or 3 sheets of medium
thickness plywood or something similar.  I will make arrangements to
pick this up in the morning and have it at Judy Bug's by 10am.
Non-itchy cellulose insulation has been purchased so all the fiberglass
weenies can still join in and remain itch free.  Be prepared to sweat
sweat sweat.  It is hot in the NOC.  Most of the tools needed are
already available at the NOC but if anyone has a kick ass circular saw
then please bring it.  We have a table saw but cutting plywood sheets
may be easier with a handheld saw.

Here is what we need to do:
   Cut 2x4's for windows
   Drill and install anchors
   Mount 2x4's
   Cut plywood for windows
   Mount plywood
   Fill gaps with GreatStuff
   Fill window boxes with inuslation
   Close up top of windows
   Enjoy reduction in temperature.

Thanks to bandwith we now have a water cooler upstairs so cold water
will be available to fight off dehydration.

See you Saturday,
Tom


--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"CHAOS706.ORG" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to [EMAIL PROTECTED]
For more options, visit this group at http://groups.google.com/group/chaos706
-~----------~----~----~----~------~----~------~--~---

Reply via email to