Hello group,

I need to install the CRS-8-DC-KIT-M on a few CRS-8. Basically this means
the change from the Fixed Configuration Power System to the Modular Power
System. I'm not able to find anywhere the kit installation guide. I wonder
if it really exists. I have queried the local SE and he was not able to help
me. Anyone has experience with this ?

Here I have the description of each Power System:

http://www.cisco.com/en/US/docs/routers/crs/crs1/8_slot/system/description/h
q6345_2.html

But no details about moving from one to the other.


Thanks.

Regards,

Antonio Soares, CCIE #18473 (R&S/SP)
amsoa...@netcabo.pt
http://www.ccie18473.net




_______________________________________________
cisco-nsp mailing list  cisco-nsp@puck.nether.net
https://puck.nether.net/mailman/listinfo/cisco-nsp
archive at http://puck.nether.net/pipermail/cisco-nsp/

Reply via email to