I was just told there is a limit of 250 MDTs on ME3600 That would not be catastrophic on its own, however I was also told that the 250MDTs limit and respectful TCAM carving also depends on the number of PEs sharing the Tree. In other words if I have 10 MVPNs each with 2 MDTs (1 Data + 1 Default) and I have 20 PEs sharing these two MVPNs, than I have reached "400MDTs" per PE which is well over the limit. Waris please, is this really true?
adam _______________________________________________ cisco-nsp mailing list [email protected] https://puck.nether.net/mailman/listinfo/cisco-nsp archive at http://puck.nether.net/pipermail/cisco-nsp/
