>Hi , >I remember someone from here saying we can set the interval from the load to a >shorter time instead of the 5 minutes. > >#show interface ... > >Tks
I vaguely remember that there is a setting to do this, put in after customer demands and against the recommendations of pretty much everyone in routing engineering. What problem are you trying to solve with a shorter interval? How would the results of the statistics change anything you are doing? Hypothetically, if you used the shortest possible interval, that of one instruction time, the utilization would either be 0% (the CPU is idle) or 100% (the CPU is doing something). The five-minute weighted moving average represents experience for spotting trends beyond instantaneous peaks. Message Posted at: http://www.groupstudy.com/form/read.php?f=7&i=29981&t=29981 -------------------------------------------------- FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]

