>Hi ,
>I remember someone from here saying we can set the interval from the load
to a
>shorter time instead of the 5 minutes.
>
>#show interface ...
>
>Tks

I vaguely remember that there is a setting to do this, put in after 
customer demands and against the recommendations of pretty much 
everyone in routing engineering.

What problem are you trying to solve with a shorter interval?  How 
would the results of the statistics change anything you are doing?

Hypothetically, if you used the shortest possible interval, that of 
one instruction time, the utilization would either be 0% (the CPU is 
idle) or 100% (the CPU is doing something).  The five-minute weighted 
moving average represents experience for spotting trends beyond 
instantaneous peaks.




Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=29981&t=29981
--------------------------------------------------
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]

Reply via email to