I have a simple question, can the Catalyst 2950 switch with a EMI Software Image Route i.e. does it become a L3 swithc when the EMI images is loaded, like the 3550 can with the EMI Image.
Best regards, Arni Message Posted at: http://www.groupstudy.com/form/read.php?f=7&i=57499&t=57499 -------------------------------------------------- FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]