Hi,
I have 3 catalyst 3548G with 48 port fast ethernet and 1 port of
gigabit ethernet.
One time the energy is down and all switches go down. I start switch
when return energy and ALL switches not work properly.
Switches signal all ports in yellow. I connect on console and see rom
monitor prompt and send a manually command to boot.
When switch had booted and return to work again i shutdown to test if
equipament return normally (out of rom monitor).
Switch return normally. I repeat this process 4 times and all times
work normally.
Anyone people has found this problem ?!
My customer need from me one report for this problem and i don�t have
any word to explain this case.
Thanks
Eduardo Perestrelo
CCNA / CCAI
Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=61597&t=61597
--------------------------------------------------
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]