Balbir Singh wrote:
> Peter Williams wrote:
>> Balbir Singh wrote:
>>
>>> Peter Williams wrote:
>>>
>>>> Balbir Singh wrote:
>>>>
>>>>> Peter Williams wrote:
>>>>>
>>>
>>> <snip>
>>>
>>>>> Is it possible that the effective tasks
>>>>> is greater than the limit of the group?
>>>>
>>>>
>>>>
>>>> Yes.
>>>>
>>>>> How do we handle this scenario?
>>>>
>>>>
>>>>
>>>> You've got the problem back to front.  If the number of effective 
>>>> tasks is less than the group limit then you have the situation that 
>>>> needs special handling (not the other way around).  I.e. if the 
>>>> number of effective tasks is less than the group limit then 
>>>> (strictly speaking) there's no need to do any capping at all as the 
>>>> demand is less than the limit.  However, in the case where the group 
>>>> limit is less than one CPU (i.e. less than 1000) the recommended 
>>>> thing to do would be set the limit of each task in the group to the 
>>>> group limit.
>>>>
>>>> Obviously, group limits can be greater than one CPU (i.e. 1000).
>>>>
>>>> The number of CPUs on the system also needs to be taken into account 
>>>> for group capping as if the group cap is greater than the number of 
>>>> CPUs there's no way it can be exceeded and tasks in this group would 
>>>> not need any processing.
>>>>
>>>
>>> What if we have a group limit of 100 (out of 1000) and 150 effective 
>>> tasks in
>>> the group? How do you calculate the cap of each task?
>>
>>
>> Personally I'd round up to 1 :-) but rounding down to zero is also an 
>> option.  The reason I'd opt for 1 is that a zero cap has a special 
>> meaning i.e. background.
>>
>>> I hope my understanding of effective tasks is correct.
>>
>>
>> Yes, but I think that you fail to realize that this problem (a lower 
>> limit to what caps can be enforced) exists for any mechanism due to 
>> the fact we're stuck with discrete mathematics in computers.  This 
>> includes floating point representations of numbers which are just 
>> crude (discrete maths) approximations of real numbers.
> 
> I do appreciate and realize the problem, thats why I asked the question.
> 
> There are some ways of solving this problem (that I could think about)
> 
> 1. Keep a whole number and fraction pair and increment the fraction until
>   it reaches a whole number and then schedule the task when the whole
>   number value reaches a minimal threshold. Or provide tasks with some
>   minimal whole number ticks in advance and then do not schedule them
>   again till their fractions add up to the whole number (credit system).
> 
>   For example if T1 and T2 have a cap of 0.5%. Then represent the values
>   as whole number zero and fraction represented as 1 and divisor as 2.
> 
>   Every two ticks their whole number would become 1 and fraction 0, 
> divisor 2.
>   Schedule the tasks for a tick whenever its whole number becomes 1
>   and reset then its whole number to 0.

You're over engineering and you're not solving the problem.  You're just 
moving it down a bit.

> 
> 
> 2. In a group based cap management system, schedule some tasks (highest 
> priority)
>   until their cap run out. In the subsequent rounds pick and choose 
> tasks that
>   did not get a chance to run earlier.
> 
> Solving this is indeed a interesting problem.
> 

Once again, you're over engineering and probably making the problem worse.

Peter
-- 
Peter Williams                                   [EMAIL PROTECTED]

"Learning, n. The kind of ignorance distinguishing the studious."