Hi 

With the default settings, you can create 10 phases (0-9) and
each phase has a length of 2B instructions. See .run_job.rc.tcl for more
details. In each phase you have to create some flexpoints (N) in such a
way to achieve 95% confidence interval in timing simulation. Please read
SMARTS: Accelerating microarchitecture simulation via rigorous
statistical sampling [2] for statistical details. 

On 06/18/2013 6:06,
zhangwuxiang wrote: 

> Hi! 
> I download the images of executable
cloudsuite applications on the cloudsuite website. The simics checkpoint
gives us a phase_000, and I want run it to get more phases.But I have
run the classification benchmark on flexus for four days, it still do
not finished. Does anyone use the simics checkpoint? Can give me some
information about the checkpoints, about the interval of two phase to be
set, the time to finish a benchmark start from the phase_000 checkpoint
on flexus. 
> Look forward your reply. Thank you. 
> 2013-06-18 
>
-------------------------
> 
> Best Regards! 
> MAIL:
[email protected] [1]

-- 

Regards, 
Mahmood
 

Links:
------
[1]
mailto:[email protected]
[2]
http://infoscience.epfl.ch/record/135578/files/isca03_smarts.pdf

Reply via email to