Have you visited Wally's site?
http://www.wbryant.com/StellaBoat/projlist.htm

Dennis C.
Touche' 35-1 #83
Mandeville, LA

On Mon, Jul 31, 2017 at 5:35 PM, john wright via CnC-List <
cnc-list@cnc-list.com> wrote:

> Hello everyone
>
> I am about to begin a complete refit on what is the best boat  for my
> purpose ( sailing around Cape Code as we get ready to do the Caribbean 1500
> in 2019), after looking or sailing at least 100 boat over the past 4 years.
> The boat is in better than average condition, I will post pictures later.
>
> I have the work broken down into three categories, and would appreciate
> any recommendations and reorganizing of the list.
>
> Thanks
>
> *Level 1: Repairs and Installations*
> Replace old set of AGM batteries with new set
> Remove old engine, clean and repaint engine room, rebuild engine bed as
> needed to fit the new Yanmar 3JH5e
> Replace all hoses for new engine
> Move raw water sea strainer and Racor fuel filter to easier location to
> monitor visually
> Gelcoat – fill all chips and nicks with gelcoat
> Clean stains with FSR
> Repair teak grating at pedestal (epoxy the connections to frame)
> Clean teak with teak cleaner
> Replace teak combing with thicker mahogany boards
> Clean and Polish all gelcoat surfaces
> Hull bottom – sand and repaint with anti-fouling ablative paint
> Re-install mast and tune rigging
> Make line hanger in cockpit below deck winches functional once again
> Add gasket to aft access panel under helm seat
> Repair/ refinish wood framework to companionway
> Re-varnish companionway door
> Make better drainage in port cockpit locker and revarnish partition wood
> Install the new Whale Gusher manual pump in cockpit
> Update propane solenoid
> Remake companionway door cover to fit better
> Deck and House – clean and re-varnish woodwork (handrails, dorade boxes)
> Clean and polish all stainless hardware
> Replace gasket material on all opening ports
> Repaint all dorade vents
> Replace traveler cam cleat
> Clean, sand and varnish bow platform
> Stanchion support on starboard bent – take to shop and straighten
> Add maintenance coat of varnish on floors and re-secure
> Install and varnish framework for windows
> Repair and revarnish bulkheads where needed
> Re-install all cabinets and tables
> Finish installation of canvas cover for ceiling in forward berth
> Ice box cover – install hardware and gasket
> Head – re-cut new mirror and install
> Forward cabin has trim work that needs to be installed
> Brow in forward cabin to be replaced with new trim work
>
>
> *Level 2: Updates and Improvements*
> Hull repainting – large project to be described as we get closer to that
> project
> Paint steering pedestal white
> Replace instruments
> Replace opening port in cockpit with new
> Add winch handle holders in cockpit
> Paint new non-skid in cockpit seats and floor
> Make set of cockpit cushions
> Install a cockpit shower
> Re-bed all deck gear, hardware and chainplates (last another 20 years)
> Replace all blocks with updated equipment
> Replace all running rigging
> Replace genoa sheet cars with moveable sheet lead under load
> Replace missing wood bungs on teak toe rail (may need to reset screws
> deeper as wood has shrunk over time)
> Sand toe rail and varnish
> Winches to be stripped cleaned and greased
> Paint interior of chain locker
> Make a grating for chain locker to help rode to dry
> Stanchion bases and cleats to be removed and powder coated to original
> color
> All deck non-skid to be renewed with white or Hatteras soft yellow (Tartan
> Yachts uses this style)
> Add stanchion rollers for headsail furling line to lead to cockpit
> Replace steering cables with new
> Replace all interior lighting with LED
> Install Isotherm hot water tank
> Replace interior cushions with new foam and fabrics
> Replace AC/DC switch panel with BluSea panel
> Add swim ladder
>
>
> *Level 3: Enhancements*
> Replace manual windlass with an electric version
> Upgrade chain and rope to fit new windlass
> Add pad-eye on bow platform for code zero sail
> Add Fischer Panda Perfect Power iSeries Generator
> Install reverse cycle heat and air conditioning system
> Add custom fitted mattress for sleeping berths
> New mainsail with deep double reef and Harken bat car track for ease of
> hoist
> Stack-pack for mainsail storage (see MacSails of Florida)
> Gooseneck double reefing hook from South Shore Yachts
> Replace standing rod rigging for peace of mind
> Add Code Zero sail on Facnor continuous line furling unit
> Add Wisker pole
> Upgrade roller furling unit
> Add Mantus anchor
>
>
> _______________________________________________
>
> This list is supported by the generous donations of our members. If you
> wish to make a contribution to offset our costs, please go to:
> https://www.paypal.me/stumurray
>
> All Contributions are greatly appreciated!
>
>
_______________________________________________

This list is supported by the generous donations of our members. If you wish to 
make a contribution to offset our costs, please go to:  
https://www.paypal.me/stumurray

All Contributions are greatly appreciated!

Reply via email to