[ 
https://issues.apache.org/jira/browse/AIRFLOW-719?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Bolke de Bruin updated AIRFLOW-719:
-----------------------------------
    Affects Version/s: 1.8.0

> Skipped operations make DAG finish prematurely 
> -----------------------------------------------
>
>                 Key: AIRFLOW-719
>                 URL: https://issues.apache.org/jira/browse/AIRFLOW-719
>             Project: Apache Airflow
>          Issue Type: Sub-task
>          Components: operators, scheduler
>    Affects Versions: 1.8.0
>            Reporter: Alex Van Boxel
>            Assignee: Bolke de Bruin
>            Priority: Blocker
>             Fix For: 1.8.1
>
>
> Since revision 2630361ca24737c28f458825b20ab11c9c996b17 the SKIPPED and 
> SUCCESS are treated the same, this causes the DAG to finish prematurely when 
> using a Branching operator where on branch is finished.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to