[ 
https://issues.apache.org/jira/browse/AIRFLOW-2386?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

sulphide updated AIRFLOW-2386:
------------------------------
    Description: When I run an airflow backfill using the airflow cli if the 
start date of the backfill is before the start_date of the dag, then airflow 
ignores depends_on_past and runs tasks in parallel for different days that have 
depends_on_past set to true. If the end date of the backfill is after the 
start_date of the dag then the backfill will begin respecting depends_on_past 
once it reaches the start_date of the dag. Seems like a bug.  (was: When I run 
an airflow backfill using the airflow cli if the start date of the backfill is 
before the start date of the dag, then airflow ignores depends_on_past and runs 
tasks in parallel for different days that have depends_on_past set to true. If 
the end date of the backfill is after the start_date of the dag then the 
backfill will begin respecting depends_on_past once it reaches the start_date 
of the dag. Seems like a bug.)

> airflow backfill ignores depends_on_past when backfilling before start_date
> ---------------------------------------------------------------------------
>
>                 Key: AIRFLOW-2386
>                 URL: https://issues.apache.org/jira/browse/AIRFLOW-2386
>             Project: Apache Airflow
>          Issue Type: Bug
>    Affects Versions: 1.9.0
>            Reporter: sulphide
>            Priority: Major
>
> When I run an airflow backfill using the airflow cli if the start date of the 
> backfill is before the start_date of the dag, then airflow ignores 
> depends_on_past and runs tasks in parallel for different days that have 
> depends_on_past set to true. If the end date of the backfill is after the 
> start_date of the dag then the backfill will begin respecting depends_on_past 
> once it reaches the start_date of the dag. Seems like a bug.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to