This is an automated email from the ASF dual-hosted git repository. github-merge-queue[bot] pushed a commit to branch gh-readonly-queue/main/pr-12075-29206c683c81bd4dd89fc5f7116275b68cf4d8e1 in repository https://gitbox.apache.org/repos/asf/arrow-rs.git
commit e57434dd358225790eb7d7508c4b2b5a5aa4c1b2 Author: Kosta Tarasov <[email protected]> AuthorDate: Wed Nov 4 17:15:17 2026 +0000 ci: stop Dependabot PRs entering the merge queue before PR CI finishes (#12075) # Which issue does this PR close? No linked issue. Follow-up to #11894, from [this report](https://github.com/apache/arrow-rs/pull/11894#issuecomment-6621398141) by @Jefffrey. # Rationale for this change Dependabot PRs can enter the merge queue before their PR CI finishes. Dependabot branches live in `apache/arrow-rs`, so each push also starts the `push` run of `CI`, where `Required Checks` is skipped. GitHub [reports a job skipped by a conditional as a success](https://docs.github.com/en/pull-requests/collaborating-with-pull-requests/collaborating-on-repositories-with-code-quality-features/troubleshooting-required-status-checks), and the `pull_request` run doesn't create its own `Required Checks` job until every suite finishes. Until then, the skipped check is the only one with that name on the commit. On #12051 the skipped check landed at 02:51:09 UTC, the PR first entered the queue at 03:02:28, and the real check wasn't created until 03:13:18. This doesn't let untested code merge, because the queue still needs a passing `merge_group` run. All 100 PRs merged after #11894, including #12051, had one before merging. The cost is that a Dependabot PR with failing CI could hold one of the queue's two build slots until its queue run fails. # What changes are included in this PR? Add `dependabot/**` to the `branches-ignore` list of the `push` trigger, as [DataFusion's `rust.yml`](https://github.com/apache/datafusion/blob/main/.github/workflows/rust.yml) already does, and update the matching assertion in `check-ci-config.py`. The `pull_request` and `merge_group` triggers don't change, so Dependabot PRs get the same PR and queue CI as before. Two limits: - Other branches pushed to `apache/arrow-rs` still get the skipped check. All 7 same-repo PRs merged after #11894 came from Dependabot, so this covers what we see today. - A fork's own `dependabot/**` branches also stop running push CI. That only affects the informational `CI (fork)` check. # Are these changes tested? The `check-ci-config.py` assertion now requires the exclusion and fails without it. It can't show the queue behavior, so that needs checking on a real Dependabot PR after this merges: it should not be possible to queue the PR until its PR CI finishes. # Are there any significant user-facing changes? No. 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-authored-by: Claude Opus 5.5 <[email protected]> --- .github/ci/scripts/check-ci-config.py | 2 +- .github/workflows/ci.yml | 3 +++ 2 files changed, 4 insertions(+), 1 deletion(-) diff --git a/.github/ci/scripts/check-ci-config.py b/.github/ci/scripts/check-ci-config.py index c68c36eb7c..be1a4526b0 100644 --- a/.github/ci/scripts/check-ci-config.py +++ b/.github/ci/scripts/check-ci-config.py @@ -136,7 +136,7 @@ def validate_config(root=ROOT): assert set(events) == {"pull_request", "push", "merge_group", "workflow_dispatch"}, "Unexpected CI triggers" assert events["pull_request"] is None, "Required CI must run on every PR" assert events["merge_group"] == {"types": ["checks_requested"]}, "Missing queue trigger" - assert events["push"] == {"branches-ignore": ["asf-site", "gh-readonly-queue/**"]}, "Fork branches must trigger CI without queue-branch push runs" + assert events["push"] == {"branches-ignore": ["asf-site", "gh-readonly-queue/**", "dependabot/**"]}, "Fork branches must trigger CI without queue-branch or Dependabot push runs" validate_fork_ci(workflows, ci) gate = jobs["required-checks"] diff --git a/.github/workflows/ci.yml b/.github/workflows/ci.yml index 2bf371ab51..f533b9f832 100644 --- a/.github/workflows/ci.yml +++ b/.github/workflows/ci.yml @@ -29,6 +29,9 @@ on: # Merge queue commits are validated by the merge_group event, not push. # A skipped Required Checks job on a queue-branch push can satisfy the gate early. - 'gh-readonly-queue/**' + # Dependabot branches live upstream, so their push runs skip Required Checks. + # That skip can let the PR enter the merge queue before its PR run finishes. + - 'dependabot/**' workflow_dispatch: concurrency:
