Alexey Romanenko created BEAM-3409:
--------------------------------------

             Summary: Unexpected behavior of DoFn teardown method running in 
unit tests 
                 Key: BEAM-3409
                 URL: https://issues.apache.org/jira/browse/BEAM-3409
             Project: Beam
          Issue Type: Bug
          Components: testing
            Reporter: Alexey Romanenko
            Assignee: Jason Kuster
            Priority: Minor


Writing a unit test, I found out a strange behaviour of Teardown method of DoFn 
implementation when I run this method in unit tests using TestPipeline.

To be more precise, it doesn’t wait until teardown() method will be finished, 
it just exits from this method after about 1 sec (on my machine) even if it 
should take longer (very simple example - running infinite loop inside this 
method or put thread in sleep). In the same time, when I run the same code from 
main() with ordinary Pipeline and direct runner, then it’s ok and it works as 
expected - teardown() method will be performed completely despite how much time 
it will take.

I created two test cases to reproduce this issue - the first one to run with 
main() and the second one to run with junit. They use the same implementation 
of DoFn (class LongTearDownFn) and expects that teardown method will be running 
at least for SLEEP_TIME ms. In case of running as junit test it's not a case 
(see output log).

- run with main()
https://github.com/aromanenko-dev/beam-samples/blob/master/runners-tests/src/main/java/TearDown.java

- run with junit
https://github.com/aromanenko-dev/beam-samples/blob/master/runners-tests/src/test/java/TearDownTest.java



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to