luigidemasi commented on issue #79: URL: https://github.com/apache/camel-kit/issues/79#issuecomment-6336896989
> Comment by [luigidemasi](https://github.com/luigidemasi) on 2026-08-19 ([original](https://github.com/luigidemasi/camel-kit/issues/149#issuecomment-5342615699)). --- Closing: the last acceptance criterion completed on 2026-08-19. **Authenticated Pi/Linux run through the registered entry point** — a document-driven workflow with oversight `never`, started, resumed, and aborted only through the registered `camel-kit ship` command at the merged thin-delegate main: - **Configuration:** Pi `0.83.0` and Node `22.22.2` — the maintained pins, both recorded `supported` in the Stamp — with the Bubblewrap sandbox on a merged-/usr Linux host (amd64, Java 21, Camel 4.21.0 recorded for diagnostics). The Pi executable was version-pinned deliberately: the globally installed Pi had self-updated to 0.84.2 the same day, so the run used a separately installed 0.83.0, and the Stamp records that exact executable path and version. - **Stages:** all five completed. Execute needed two attempts — the first returned a prose-wrapped result, and the controller rejected it as an invalid typed stage result instead of committing it; the resumed attempt completed. The worker model was `nvidia/nemotron-3.5-lightning:free` via OpenRouter through the Pi harness; provider credentials stayed with the harness throughout, per the product boundary. - **Stamp:** `pass`, with all six mandatory checks passing — artifact policy, catalog usage, route schema, package-and-inspect, runtime resolve-and-start, and one discovered and executed Citrus test — each with retained, digest-bound command evidence. - **Publication:** the route, Citrus test, `.camel-kit/config.properties`, `pom.xml`, and artifact manifest were published to the project only after validation, through the guarded publication path. An earlier run the same day failed closed at discovery when the first free-tier model endpoint returned repeated upstream 429 errors; it was explicitly aborted and retained as evidence of the failure path — the controller never committed a stage on degraded worker output. Website: the Ship cutover merged earlier as camel-kit-web#28; the live-gate status sentence is updated in camel-kit-web#29. All acceptance and delivery checklist items are now complete. -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. To unsubscribe, e-mail: [email protected] For queries about this service, please contact Infrastructure at: [email protected]
