SEZ9 commented on PR #12460:
URL: https://github.com/apache/seatunnel/pull/12460#issuecomment-5945071702

   @nzw921rx thanks for the quick turnaround and for the ping.
   
   As noted in my latest review, the High items from the earlier round are 
resolved on the current head. A few follow-ups before we move toward merge:
   
   1. **WIP checkpoint commit.** The earlier head (`0f83be84`) carried the 
commit `[Improve][Zeta] Refactor application commands and cluster descriptors` 
with the message "Save the current application-mode refactoring for continued 
development. Full build and tests are not yet verified." If that commit is 
still in the branch history, please reword or squash it so we don't ship a "not 
yet verified" checkpoint.
   
   2. **Architecture rewrite between `ea12ee13` and `0f83be84`.** The 
submission and master-lifecycle path I reviewed in the first two rounds was 
replaced rather than modified. Could you add a short note to the PR description 
explaining why the rewrite was needed and how the new 
submission/master-lifecycle flow works end to end? That will help future 
readers and lets us confirm the docs match the final design.
   
   3. **Areas I only skimmed.** I have not yet read in depth the YARN provider 
bodies, the rewritten `SeatunnelApplicationConfig` / 
`ApplicationSpecification`, or the two E2E suites beyond their pass/fail 
status. I'll go through those next; if anything in the YARN path is still 
incomplete or untested, please call it out now so I don't review it as final.
   
   Thanks again for the persistence on this one.
   
   <!-- streview-comment:1462 -->


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to