[
https://issues.apache.org/jira/browse/SENTRY-1101?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Hao Hao updated SENTRY-1101:
----------------------------
Attachment: SENTRY-1101.0.patch
> When edit log for HDFS sync in Sentry Server is full, the next Path update is
> not correctly setup
> -------------------------------------------------------------------------------------------------
>
> Key: SENTRY-1101
> URL: https://issues.apache.org/jira/browse/SENTRY-1101
> Project: Sentry
> Issue Type: Bug
> Components: Sentry
> Reporter: Hao Hao
> Assignee: Hao Hao
> Fix For: 1.7.0
>
> Attachments: SENTRY-1101.0.patch
>
>
> The edit log for caching the path updates is not updated properly once the
> cache is full in Sentry Server side. In that case, even though the path
> updates will be send to NN plugin, the path updates itself is not containing
> the correct paths. It can cause unexpected ACL behavior issues during table
> creation.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)