Dear Wiki user,

You have subscribed to a wiki page or wiki category on "Shale Wiki" for change 
notification.

The following page has been changed by samzhou:
http://wiki.apache.org/shale/samzhou

New page:
1.Quality Guarantee

DE-YING [http://www.towercrane-cn.com tower crane] has been awarded "Famous 
Product" by Jiaxing Famous Product Accreditation Committee, and gained the 
certificate of ISO9001:2000 and CE certificate by SGS. 
2.Enterprise Credit

DEYING is awarded Credit A——" Contract observer, Credit Keeper" by Pinghu 
Administration of Industry and Commerce.

3. Cost efficiency

DEYING is the leader among manufacturers of [http://www.towercrane-cn.com tower 
crane manufacture] base in Zhejiang Province.

4.Technique


We inherit Potain technique and modify with state-of-art equipment, which leads 
to our up-to-day products. We apply crassitude drum technique, which will solve 
the common problem that wire rope twists when in service.  

5. Manufacturing Quality

Zhejiang Deying Architectural Machinery Manufacture Co.,Ltd has got the 
qualification of [http://www.towercrane-cn.com tower crane manufacturing] with 
Manufacture License of Special Equipment People's Republic of China. 
[http://www.towercrane-cn.com/page/DEYING%20products.asp Tower crane dealer], 
[http://www.towercrane-cn.com/page/DEYING%20products.asp tower crane Seller]

6.Safety

Tower crane belongs to special equipment of People's Republic of China, the 
safety of tower crane is closely relative to people's life and property. DEYING 
equips safety protector. 


Weight limiter uses pull-ring structure made by foreign advanced technique. 
Moment limiter is adaptable in hash wildness environment and ensures the 
limiter is sensitive and reliable to avoid security accidents  caused of 
malpractice operation of tower crane, like doverload. 

7. Production Process


①Welding: We apply CO2 gas shielded welding,inverted automatic submerged 
arc welding machine welding, semi-automatictrolley-style welding, and arrange 
instruction, assessment and confirmation of special process.

②mechanical processing: Standard fixture for mast sections and joint 
guarantees the processing precision.

③Paint spray: We apply shot-blast before manual painting to improve the 
surface intensity so that the paint could last longer like fresh. 

8. Specialization and standardization

The factory is equipped by full facilities, which is divided into four 
specialized workshop. 

The factory takes up 45000m2, , and is now being enlarging. We apply CNC 
cutting machine、 Inverted automatic submerged arc welding machine、Gas 
shielded welder、Milling machine、double-sided 
milling、shot-blasting、Paint spraying line, etc., all of which provide 
outstanding security for high quality of tower crane.

9.Malfunction Rate

Generally, electric failure covers about 70% of the malfunction of 
[http://www.towercrane-cn.com/page/chinese%20Tower%20Crane%20manufactory.html 
tower crane]. To solve this problem, we choose Schneider electric parts and 
modify the system, which gives more assurance to normal performance of tower 
crane, bringing down malfunction rate.

10. After sales service

Assist the users to make construction proposal for the first time if required.
Equipment debugging installation
Training operators on the spot fixes the breakdown fast and actively Provide 
technical supports
----
CategoryCategory

Reply via email to