[
https://issues.apache.org/jira/browse/HADOOP-5170?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12726633#action_12726633
]
Arun C Murthy commented on HADOOP-5170:
---------------------------------------
bq. If the patch interacts poorly with the capacity scheduler, wouldn't it make
more sense to tell users of the capacity scheduler not to use this feature, or
to improve MAPREDUCE-516 so that it can take into account task limits?
Like I said, this patch introduced 2 features: per-node limits and per-job
limits. The per-job cluster limit interacts poorly with the MAPREDUCE-516, not
per-node limits.
bq. The situation described in the original task was that a task is very
CPU-intensive. The user wanted to limit the number of those tasks running to
less than the number of cores. However, there is no need to fill up all slots
on the machine - the other slots could be used for less CPU-intensive tasks.
Until there is a model for all system resources in the capacity scheduler, this
patch lets users with that kind of problem achieve reasonable behavior.
We are missing the woods for the trees here. The user whose task is
CPU-intensive is happy. But, what about the other users whose tasks need CPU
too? How do we keep their tasks from starving on the same node? In particular
there are no checks and balances on preventing multiple CPU-intensive tasks
from being scheduled on the same node. If we *knew* that the other tasks were
going to be IO intensive we could co-schedule them on this node, but we don't.
This is the reason why Owen and I continue to insist that per-node task limits
are a poor substitute for modelling resource usage and that a resource model is
a *pre-requisite* for this feature.
This feature works well for clusters with single users, but not in shared
clusters.
bq. One situation in which you want to limit tasks on the whole cluster is if
you have a housekeeping job with long tasks, e.g. a database import or export.
If you don't have a limit on running tasks, such a job can take up the whole
cluster and hold it for a long time.
The short-term fix is to submit these jobs to a special queue with limited
capacity, possibly to queues with a hard upper-limit on their capacity:
MAPREDUCE-532.
> Set max map/reduce tasks on a per-job basis, either per-node or cluster-wide
> ----------------------------------------------------------------------------
>
> Key: HADOOP-5170
> URL: https://issues.apache.org/jira/browse/HADOOP-5170
> Project: Hadoop Common
> Issue Type: New Feature
> Components: mapred
> Reporter: Jonathan Gray
> Assignee: Matei Zaharia
> Fix For: 0.21.0
>
> Attachments: HADOOP-5170-tasklimits-v3-0.18.3.patch,
> tasklimits-v2.patch, tasklimits-v3-0.19.patch, tasklimits-v3.patch,
> tasklimits-v4-20.patch, tasklimits-v4.patch, tasklimits.patch
>
>
> There are a number of use cases for being able to do this. The focus of this
> jira should be on finding what would be the simplest to implement that would
> satisfy the most use cases.
> This could be implemented as either a per-node maximum or a cluster-wide
> maximum. It seems that for most uses, the former is preferable however
> either would fulfill the requirements of this jira.
> Some of the reasons for allowing this feature (mine and from others on list):
> - I have some very large CPU-bound jobs. I am forced to keep the max
> map/node limit at 2 or 3 (on a 4 core node) so that I do not starve the
> Datanode and Regionserver. I have other jobs that are network latency bound
> and would like to be able to run high numbers of them concurrently on each
> node. Though I can thread some jobs, there are some use cases that are
> difficult to thread (scanning from hbase) and there's significant complexity
> added to the job rather than letting hadoop handle the concurrency.
> - Poor assignment of tasks to nodes creates some situations where you have
> multiple reducers on a single node but other nodes that received none. A
> limit of 1 reducer per node for that job would prevent that from happening.
> (only works with per-node limit)
> - Poor mans MR job virtualization. Since we can limit a jobs resources, this
> gives much more control in allocating and dividing up resources of a large
> cluster. (makes most sense w/ cluster-wide limit)
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.