DO NOT REPLY TO THIS EMAIL, BUT PLEASE POST YOUR BUGĀ· RELATED COMMENTS THROUGH THE WEB INTERFACE AVAILABLE AT <http://issues.apache.org/bugzilla/show_bug.cgi?id=39254>. ANY REPLY MADE TO THIS MESSAGE WILL NOT BE COLLECTED ANDĀ· INSERTED IN THE BUG DATABASE.
http://issues.apache.org/bugzilla/show_bug.cgi?id=39254 Summary: Expose DateIterator or add DateUtils.iterator(startDate, endDate) Product: Commons Version: unspecified Platform: Other OS/Version: other Status: NEW Severity: normal Priority: P2 Component: Lang AssignedTo: commons-dev@jakarta.apache.org ReportedBy: [EMAIL PROTECTED] The DateUtils.iterator methods only work with the preset date ranges indicated by constants in the class. It would be very useful to be able to iterate through each day between a user-specified start date and an end date. This could be as simple as making the static DateIterator inner class of DateUtils public (it's package protected now). Or, if that's not appealing for some reason, another iterator method could be added that takes the start date and end date and returns a DateIterator instance as Iterator. -- Configure bugmail: http://issues.apache.org/bugzilla/userprefs.cgi?tab=email ------- You are receiving this mail because: ------- You are the assignee for the bug, or are watching the assignee. --------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]