not possilble until Continuum 1.1 However, I have the same requirement and the trick is to write a cron job to delete one of file under the source tree. I would pick a dummy file thou.
it is a hack job, since your cronjob must know the exact location of source tree using its assigned id. -D On 4/25/06, Peter Mueller <[EMAIL PROTECTED]> wrote: > > Is there a configuration option in 1.0.3 that allows the scheduler to > build no matter if there is no change? > > INFO | jvm 1 | 2006/04/25 14:15:01 | 2006-04-25 14:15:01,125 > [Thread-2] INFO BuildController - The project was not > built because there are no changes. > > Thnx, > > P >
