not possilble until Continuum 1.1

However, I have the same requirement and the trick is to write a cron job to
delete one of file
under the source tree.  I would pick a dummy file thou.

it is a hack job, since your cronjob must know the exact location of source
tree using its assigned id.

-D


On 4/25/06, Peter Mueller <[EMAIL PROTECTED]> wrote:
>
> Is there a configuration option in 1.0.3 that allows the scheduler to
> build no matter if there is no change?
>
> INFO   | jvm 1    | 2006/04/25 14:15:01 | 2006-04-25 14:15:01,125
> [Thread-2] INFO  BuildController                - The project was not
> built because there are no changes.
>
> Thnx,
>
> P
>

Reply via email to