not in 1.0.3.

workaround is to create a cron job and remove one of your working area files

-D


On 9/28/06, Bruno Cavaler Ghisi <[EMAIL PROTECTED]> wrote:

Hi all!

I am using Continuum 1.0.3, Subversion as repository and I have 4 ant
projects.

Sometimes it seems that Continuum stops building the projects that are
scheduled to run hourly. I was looking the log and reading about it and
I was wondering if its stops are because no changes were made. Is it
possible to make Continuum run hourly without any changes made in the
Subversion repository because I really need to run it every hour.

Thanks.
Bruno C Ghisi

Reply via email to