Haijun Cao wrote:
Hi,



I am using 0.18.2 with fair scheduler hadoop-3476.
The purpose of fair scheduler is to prevent long running jobs
from blocking short jobs. I gave it a try --- start a long job first, then a
short one. The short job is able to grab some map slot and finishes its map
phase quickly, but it still blocks on reduce phase. Because the long job has
taken all the reduce slots (because the long job starts first and its reducers
are started shortly after).
The long job’s reducer won’t finish until all its mappers
have finished. So my short job is still blocked by the long job…. Making the
fair scheduler useless for my workload.
I am wondering if there is a way to NOT to start reduce task until all its mappers have finished.
https://issues.apache.org/jira/browse/HADOOP-4666 is opened to address something similar. Starting the reducers after all the maps are done might result into increased runtime of the job. The reason for starting the reducers along with the maps is to interleave/parallelize map and shuffle(data-pulling) phase since maps are typically cpu bound while shuffle is io bound.
Amar
Thanks

Haijun Cao



Reply via email to