Hello Steve et al,
the call for updated translations was issued this morning with a
target date of december 4th.

After that I intend to prepare a NMU for shim-signed closing the l10n
and possibly other low hanging bugs / issues. Please inform me if you
want to do a MU instead (preferred).

Greetings

             Helge
-- 
      Dr. Helge Kreutzmann                      he...@helgefjell.de
            Dipl.-Phys.                       http://www.helgefjell.de
        64bit GNU powered                     gpg signed mail preferred
           Help keep free software "libre": http://www.ffii.de/

Attachment: signature.asc
Description: Digital signature

Reply via email to