[ https://issues.apache.org/jira/browse/DERBY-2281?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Laura Stewart updated DERBY-2281: --------------------------------- Attachment: itserv_os.jpg itserv_os.gif Attaching updated graphic files in both gif and jpg formats. I think that there should be some additional spacing vertically to separate the 3 SELECT statements and associated objects and cache. Please review and let me know of any changes that need to be made. After I receive all of the comments, I'll post html files and a patch file. > Update the Tuning Guide figure about using the statement cache > -------------------------------------------------------------- > > Key: DERBY-2281 > URL: https://issues.apache.org/jira/browse/DERBY-2281 > Project: Derby > Issue Type: Bug > Components: Documentation > Affects Versions: 10.2.3.0 > Reporter: Laura Stewart > Assigned To: Laura Stewart > Priority: Minor > Attachments: itserv_os.gif, itserv_os.jpg > > > The second figure in file ctundepth32379.dita needs to be updated. > These comments came from Stan Bradbury as part of his review for Derby-1842 > Fig 2 : The graphic is not correct - I suggest a horizontal line separating > Connection One and Connection Two (line should run under the TOP select, it's > three exection-arrows and the TOP Statement Object) - label: 'Connection One' > should be ABOVE the Select statement and FIRST execution-arrow for the > Connection (not below an execution-arrow). > Label 'Connection Two' should be above the SECOND select (below the added > line) and it's FIRST execution-arrow (the second solid arrow). This arrow > needs to be the only arrow pointing to the SECOND Statement Object. > Replace the dotted line at the bottom with a STRAIGTH, SOLID line that runs > STRAIGHT between the BOTTOM select statement and the BOTTOM (third) Statement > Object. There is no 'elbow' arrow for the second connection. > It is not clear that the only the TOP select AND the TOP Statement Object are > part of Connection One. All three Connection One execution-arrows need to > point to the SAME (TOP) Statement Object. The next TWO selects, > exectuion-arrows and Statement Objects need to be in do not line up properly > . --The arrows between the Statment Objects and the Statement Cache pages are > good. -- This message is automatically generated by JIRA. - You can reply to this email to add a comment to the issue online.