Hi all, My preference is Option A: one complete PR organized into three dependency-ordered commits.
The API and CDC slices do not provide standalone user-facing value without the Elasticsearch/OpenSearch sink, while one PR allows the complete MySQL-CDC -> Zeta -> Elasticsearch/OpenSearch E2E suite to run before merge. Review can still proceed commit by commit; squash happens only after the complete implementation has been reviewed and approved. The commits will follow the three STIP slices: 1. Shared API and engine contract. 2. MySQL-CDC source. 3. Elasticsearch/OpenSearch sink, E2E, and documentation. If the community prefers stacked PRs, I can use the same three boundaries. Best regards, zy Tao zy Tao <[email protected]> 于2026年11月18日周三 17:31写道: > Hi Daniel, SEZ9, and the SeaTunnel community, > > Following up on this STIP-42 thread. The revised v1 scope (MySQL-CDC -> > Zeta -> Elasticsearch/OpenSearch, keeping existing MySQL JDBC behavior > unchanged, and requiring a strict full-cluster Zeta upgrade) is now > documented in the issue and has been confirmed there by SEZ9: > https://github.com/apache/seatunnel/issues/12923 > > To reach consensus and move STIP-42 to Accepted, could the community > please confirm: > 1. Are there any objections to STIP-42 as documented in #12923? > 2. Delivery preference (given squash-merge): one complete PR vs. three > dependency-ordered stacked PRs (API/engine boundaries, MySQL-CDC source, > Elasticsearch/OpenSearch sink)? > > Implementation remains on hold until this thread reaches consensus, and I > will post the final summary back to #12923. > > Best regards, > zy Tao > GitHub: https://github.com/taozhiyi13 > > zy Tao <[email protected]> 于2026年11月4日周三 17:17写道: > >> Hi community, >> >> I would like to start a discussion about STIP-42, which proposes a shared >> spatial data contract from MySQL-CDC to Elasticsearch/OpenSearch. >> >> Detailed proposal: >> https://github.com/apache/seatunnel/issues/12923 >> >> Background >> >> SeaTunnel currently has no end-to-end contract for MySQL spatial values. >> >> MySQL-CDC receives non-null spatial values as Debezium Point or Geometry >> structures. The existing BYTES conversion path cannot decode these >> structures into a usable SeaTunnel row value. The Elasticsearch/OpenSearch >> sink also cannot derive geo_point or geo_shape mappings from an opaque >> binary schema. >> >> This means the following path is currently unsupported: >> >> MySQL-CDC >> -> SeaTunnel >> -> Elasticsearch/OpenSearch >> >> Proposed solution >> >> STIP-42 introduces a shared API-level spatial contract: >> >> - GeometryType(GeometryKind) describes the schema type and geometry kind. >> - Geometry contains the row-level unsigned SRID and standard 2D WKB. >> - MySQL-CDC converts Debezium spatial structures into this shared >> representation. >> - Elasticsearch/OpenSearch maps POINT to geo_point and the other geometry >> kinds to geo_shape. >> - The source preserves the original SRID and coordinate order. >> - The sink accepts SRID 4326 and does not reproject or modify coordinates. >> >> The first version supports all eight MySQL spatial types: >> >> - GEOMETRY >> - POINT >> - LINESTRING >> - POLYGON >> - MULTIPOINT >> - MULTILINESTRING >> - MULTIPOLYGON >> - GEOMETRYCOLLECTION >> >> It covers MySQL-CDC snapshot and binlog INSERT, UPDATE, and DELETE events. >> >> Why use a shared API type >> >> Using BYTES would leave the spatial format, geometry kind, and SRID >> implicit. Each downstream connector would need to understand the MySQL or >> Debezium representation independently. >> >> The shared GeometryType and Geometry classes provide a source- and >> sink-neutral contract. The API does not contain MySQL framing, >> Elasticsearch mapping types, GeoJSON, or a target-specific SRID policy. >> >> The first implementation is intentionally limited to MySQL-CDC and >> Elasticsearch/OpenSearch. Future sources and sinks may explicitly adopt the >> same contract after implementing and testing it; no connector gains spatial >> support automatically. >> >> First-version boundaries >> >> The first version supports: >> >> - MySQL-CDC schema discovery, snapshot, and binlog decoding; >> - Zeta schema, row, and checkpoint serialization; >> - Elasticsearch/OpenSearch geo_point and geo_shape mapping; >> - new-index mapping creation; >> - existing-index mapping validation before source rows are consumed; >> - column-level and row-level SRID validation; >> - checkpoint and restore behavior. >> >> The following are outside the first version: >> >> - MySQL JDBC Source adoption of GeometryType; >> - MySQL JDBC Sink geometry support; >> - coordinate reprojection; >> - runtime spatial schema evolution; >> - manual GEOMETRY schema declarations; >> - spatial transforms and functions; >> - spatial execution on Flink or Spark; >> - dynamic or placeholder Elasticsearch index names. >> >> Flink and Spark will reject GEOMETRY during planning before a source >> reader consumes rows. Geometry schemas using dynamic or placeholder index >> names will be rejected during sink creation because their concrete mappings >> cannot be validated before data is read. >> >> JDBC compatibility >> >> The current MySQL JDBC behavior remains unchanged. >> >> MySQL JDBC Source continues to expose generic GEOMETRY as BYTES. Existing >> MySQL-to-MySQL binary transport, TiDB catalog behavior, and the StarRocks >> JDBC-compatible dialect do not adopt GeometryType. >> >> This is different from MySQL-CDC: JDBC already has a usable opaque-binary >> transport contract, while non-null CDC spatial values have no working >> historical end-to-end contract. >> >> The first version therefore treats MySQL-CDC geometry as a new capability >> and introduces no JDBC schema migration. >> >> Zeta upgrade boundary >> >> GeometryType is transported in the Zeta job action graph, and Geometry is >> transported as a SeaTunnelRow field through RecordSerializer. >> >> An old cluster member does not contain these classes and cannot >> deserialize the new schema or row value. Spatial jobs therefore require a >> strict full-cluster upgrade: >> >> - the client, all masters, all workers, and any cluster member that may >> deserialize job or state objects must use a compatible version; >> - mixed-version execution of a spatial job is unsupported; >> - a spatial checkpoint or savepoint can only be restored on a fully >> upgraded cluster; >> - downgrading a spatial job after it has produced new state is >> unsupported. >> >> If this boundary is violated, failure may occur during action, task, row, >> or checkpoint deserialization. This is not presented as graceful >> pre-dispatch rejection. >> >> Non-spatial jobs do not contain GeometryType or Geometry, and this >> proposal does not change their existing schema, row, or checkpoint >> representations. >> >> Implementation organization >> >> After the STIP is accepted, the work will be divided into three >> dependency-ordered and independently testable slices: >> >> 1. Shared API types, Zeta serialization, Flink/Spark planning guards, and >> upgrade/restore tests. >> 2. MySQL-CDC schema mapping, Debezium decoding, metadata, and checkpoint >> tests. >> 3. Elasticsearch/OpenSearch mapping, validation, documentation, and >> end-to-end tests. >> >> SeaTunnel PRs are squash-merged, so I would also like community feedback >> on the delivery form: >> >> - one PR containing the complete dependency-ordered implementation; or >> - stacked PRs in which each slice can be reviewed and tested >> independently. >> >> No implementation PR will be opened before the STIP is accepted. >> >> Questions for the community >> >> I would particularly appreciate feedback on: >> >> 1. Is GeometryType and Geometry an appropriate shared cross-connector >> contract? >> 2. Is the MySQL-CDC-only first-version scope appropriately bounded? >> 3. Is preserving the existing JDBC BYTES behavior the correct >> compatibility decision? >> 4. Is the strict full-cluster upgrade boundary acceptable for the first >> version? >> 5. Should the implementation be delivered as one complete PR or >> dependency-ordered stacked PRs? >> >> The full serialization inventory, SRID rules, mapping validation >> contract, compatibility decisions, and test plan are documented in the STIP: >> >> https://github.com/apache/seatunnel/issues/12923 >> >> Related feature request: >> https://github.com/apache/seatunnel/issues/12832 >> >> Any feedback is welcome. >> >> Best regards, >> zy Tao >> GitHub: https://github.com/taozhiyi13 >> >
