[
https://issues.apache.org/jira/browse/ACTIVEMQ6-94?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14508933#comment-14508933
]
ASF GitHub Bot commented on ACTIVEMQ6-94:
-----------------------------------------
Github user clebertsuconic commented on the pull request:
https://github.com/apache/activemq-6/pull/211#issuecomment-95560165
I will take a look...
But the only thing supposed to wait on the channel is flow control.... that
previous fix is not valid (it would cause serious performance issues on regular
cases).
Besides 50M minLargeMessageSize is an invalid test.
> HornetQ Bridge does not handle large messages
> ---------------------------------------------
>
> Key: ACTIVEMQ6-94
> URL: https://issues.apache.org/jira/browse/ACTIVEMQ6-94
> Project: Apache ActiveMQ 6
> Issue Type: Bug
> Affects Versions: 6.0.0
> Reporter: Howard Gao
> Assignee: Howard Gao
> Fix For: 6.1.0
>
>
> When sending a large message that exceeds the size of Integer.MAX_VALUE, the
> bridge will get negative chunk size during fowarding. And the resend cache is
> not limited so there is a potential that it may get OutOfMemory exception.
> Related jira:
> https://issues.jboss.org/browse/HORNETQ-1465
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)