[ 
https://issues.apache.org/jira/browse/AIRAVATA-1436?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Suresh Marru updated AIRAVATA-1436:
-----------------------------------
    Labels: gsoc2022 gsoc2023  (was: gsoc2022)

> Provide meta scheduling capabilities within Airavata
> ----------------------------------------------------
>
>                 Key: AIRAVATA-1436
>                 URL: https://issues.apache.org/jira/browse/AIRAVATA-1436
>             Project: Airavata
>          Issue Type: Epic
>          Components: Airavata Orchestrator, GFac
>            Reporter: Suresh Marru
>            Priority: Major
>              Labels: gsoc2022, gsoc2023
>             Fix For: WISHLIST
>
>
> As discussed on the architecture mailing list [1] and summarized at [2], 
> Airavata will need to develop a metascheduler. In the short term, a user 
> request (demeler, gobert) is to have airavata throttle jobs to resources. In 
> the future more informed scheduling strategies needs to be integrated. 
> Hopefully, the actual scheduling algorithms can be borrowed from third party 
> implementations. 
> [1] - http://markmail.org/message/tdae5y3togyq4duv
> [2] - 
> https://cwiki.apache.org/confluence/display/AIRAVATA/Airavata+Metascheduler



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to