There are a lot of long pending PR, would be good to merge them before 2.4. Some are bringing tests for the 2.3 release which can be critical to include.
Maybe we should list the pr and jira we want it before picking a date? Le 20 févr. 2018 22:02, "Konstantinos Katsiapis" <[email protected]> a écrit : > +1 since tf.transform <https://github.com/tensorflow/transform> 0.6 > depends on Beam 2.4 and Tensorflow 1.6 (and the latter already has an RC > out, so we will likely be blocked on Beam). > > On Tue, Feb 20, 2018 at 12:50 PM, Robert Bradshaw <[email protected]> > wrote: > >> Now that Beam 2.3.0 went out (and in record time, kudos to all that >> made this happen!) It'd be great to keep the ball rolling for a >> similarly well-executed 2.4. A lot has gone in [1] since we made the >> 2.3 cut, and to keep our cadence up I would propose a time-based cut >> date early next week (say the 28th). >> >> I'll volunteer to do this release. >> >> [1] https://github.com/apache/beam/compare/release-2.3.0...master >> > > > > -- > Gus Katsiapis | Software Engineer | [email protected] | 650-918-7487 >
