*are _not_ on the burndown :-)

On Wed, Feb 21, 2018 at 9:31 AM, Kenneth Knowles <[email protected]> wrote:

> Romain - it looks like these JIRA tickets are on on the 2.4.0 burndown.
> Can you set their Fix Version field to make sure they are tracked and
> triaged?
>
>
> On Tue, Feb 20, 2018 at 10:22 PM, Reuven Lax <[email protected]> wrote:
>
>> I think it's fair to request that the reviewers of these PRs help with
>> your effort to get them merged before the 2.4.0 cut. Existing comments on
>> the PR imply that reviewers think the approaches are reasonable. Assuming
>> that there's not too much work left to be done to address comments, there's
>> a good chance of getting them in.
>>
>> Reuven
>>
>> On Tue, Feb 20, 2018 at 10:10 PM, Romain Manni-Bucau <
>> [email protected]> wrote:
>>
>>> Ok
>>>
>>> In terms of what I'd like included, here is the list:
>>>
>>> 1. https://github.com/apache/beam/pull/4412 (important to prevent
>>> regressions)
>>> 2. https://github.com/apache/beam/pull/4674 (can need some more work
>>> but can break some api if we do, so current state is a functional trade
>>> off). On a more personal side Im blocked by this one for some features.
>>> 3. https://github.com/apache/beam/pull/4372 (important cause doesnt
>>> make the execution deterministic depending your surefire config, IDE, main
>>> usage)
>>>
>>>
>>>
>>> Le 21 févr. 2018 01:29, "Reuven Lax" <[email protected]> a écrit :
>>>
>>>> +1, this is keeping with an every-six weeks cadence.
>>>>
>>>> Romain, you can always target Jiras to this release, and then the
>>>> release manager can decide on a case-by-case basis whether to make sure the
>>>> fix is included.
>>>>
>>>> On Tue, Feb 20, 2018 at 2:30 PM, Robert Bradshaw <[email protected]>
>>>> wrote:
>>>>
>>>>> Yep. I am starting the "Let's do a 2.4.0 release" thread almost
>>>>> exactly 6 weeks after JB first started the 2.3.0 release thread.
>>>>>
>>>>> On Tue, Feb 20, 2018 at 2:20 PM, Charles Chen <[email protected]> wrote:
>>>>> > I would like to +1 the faster release cycle process JB and Robert
>>>>> have been
>>>>> > advocating and implementing, and thank JB for releasing 2.3.0
>>>>> smoothly.
>>>>> > When we block for specific features and increase the time between
>>>>> releases,
>>>>> > we increase the urgency for PR authors to push for their change to
>>>>> go into
>>>>> > an upcoming release, which is a feedback loop that results in our
>>>>> releases
>>>>> > taking months instead of weeks.  We should however try to get
>>>>> pending PRs
>>>>> > wrapped up.
>>>>> >
>>>>> > On Tue, Feb 20, 2018 at 2:15 PM Romain Manni-Bucau <
>>>>> [email protected]>
>>>>> > wrote:
>>>>> >>
>>>>> >> Kind of agree but rythm was supposed to be 6 weeks IIRC, 2.3 is
>>>>> just out
>>>>> >> so 1 week is a bit fast IMHO.
>>>>> >>
>>>>> >> Le 20 févr. 2018 23:13, "Robert Bradshaw" <[email protected]> a
>>>>> écrit :
>>>>> >>>
>>>>> >>> One of the main shifts that I think helped this release was
>>>>> explicitly
>>>>> >>> not being feature driven, rather releasing what's already in the
>>>>> >>> branch. That doesn't mean it's not a good call to action to try and
>>>>> >>> get long-pending PRs or similar wrapped up.
>>>>> >>>
>>>>> >>> On Tue, Feb 20, 2018 at 2:10 PM, Romain Manni-Bucau
>>>>> >>> <[email protected]> wrote:
>>>>> >>> > There are a lot of long pending PR, would be good to merge them
>>>>> before
>>>>> >>> > 2.4.
>>>>> >>> > Some are bringing tests for the 2.3 release which can be
>>>>> critical to
>>>>> >>> > include.
>>>>> >>> >
>>>>> >>> > Maybe we should list the pr and jira we want it before picking a
>>>>> date?
>>>>> >>> >
>>>>> >>> > Le 20 févr. 2018 22:02, "Konstantinos Katsiapis" <
>>>>> [email protected]>
>>>>> >>> > a
>>>>> >>> > écrit :
>>>>> >>> >>
>>>>> >>> >> +1 since tf.transform 0.6 depends on Beam 2.4 and Tensorflow
>>>>> 1.6 (and
>>>>> >>> >> the
>>>>> >>> >> latter already has an RC out, so we will likely be blocked on
>>>>> Beam).
>>>>> >>> >>
>>>>> >>> >> On Tue, Feb 20, 2018 at 12:50 PM, Robert Bradshaw
>>>>> >>> >> <[email protected]>
>>>>> >>> >> wrote:
>>>>> >>> >>>
>>>>> >>> >>> Now that Beam 2.3.0 went out (and in record time, kudos to all
>>>>> that
>>>>> >>> >>> made this happen!) It'd be great to keep the ball rolling for a
>>>>> >>> >>> similarly well-executed 2.4. A lot has gone in [1] since we
>>>>> made the
>>>>> >>> >>> 2.3 cut, and to keep our cadence up I would propose a
>>>>> time-based cut
>>>>> >>> >>> date early next week (say the 28th).
>>>>> >>> >>>
>>>>> >>> >>> I'll volunteer to do this release.
>>>>> >>> >>>
>>>>> >>> >>> [1] https://github.com/apache/beam
>>>>> /compare/release-2.3.0...master
>>>>> >>> >>
>>>>> >>> >>
>>>>> >>> >>
>>>>> >>> >>
>>>>> >>> >> --
>>>>> >>> >> Gus Katsiapis | Software Engineer | [email protected] |
>>>>> >>> >> 650-918-7487
>>>>>
>>>>
>>>>
>>
>

Reply via email to