I'm working on a docs PR[1] for the 2.16 release and the RAT precommit check is stuck in the Jenkins queue (since Friday). Is it possible to move this up, or is there a way to get an estimate for how long it will take the precommit check to run?
[1] https://github.com/apache/beam/pull/9607 Best, Cyrus
