[
https://issues.apache.org/jira/browse/BIGTOP-1677?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14326303#comment-14326303
]
Olaf Flebbe edited comment on BIGTOP-1677 at 2/18/15 6:21 PM:
--------------------------------------------------------------
applied patch: thanks [~evans_ye]
was (Author: oflebbe):
applied patch
> Tez packaging is still failing
> ------------------------------
>
> Key: BIGTOP-1677
> URL: https://issues.apache.org/jira/browse/BIGTOP-1677
> Project: Bigtop
> Issue Type: Bug
> Components: build
> Affects Versions: 0.8.0
> Reporter: Evans Ye
> Assignee: Evans Ye
> Priority: Critical
> Fix For: 0.9.0
>
> Attachments: BIGTOP-1677.1.patch
>
>
> The tez rpm can not be built. After some self hacks I finally figured out the
> root cause:
> BIGTOP-1179 commit is weird. The commit message shows that it was [authored
> on 27 Nov
> 2014|https://github.com/apache/bigtop/commit/f506701c8e8cd1b9e596c3f728996c988705e7d0],
> which should be an old patch targeted on 0.5.2 instead of the new one
> authored by [~oflebbe]. The wired thing is that the tez version of that
> commit is 0.6.0, which is new, but the code in that commit looked the same as
> the old patch submitted on 27 Nov 2014.
> Anyhow, we need to sync up the code to the final reviewed version in
> BIGTOP-1179.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)