[ 
https://issues.apache.org/jira/browse/BIGTOP-1677?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14326303#comment-14326303
 ] 

Olaf Flebbe edited comment on BIGTOP-1677 at 2/18/15 6:21 PM:
--------------------------------------------------------------

applied patch: thanks [~evans_ye]


was (Author: oflebbe):
applied patch

> Tez packaging is still failing
> ------------------------------
>
>                 Key: BIGTOP-1677
>                 URL: https://issues.apache.org/jira/browse/BIGTOP-1677
>             Project: Bigtop
>          Issue Type: Bug
>          Components: build
>    Affects Versions: 0.8.0
>            Reporter: Evans Ye
>            Assignee: Evans Ye
>            Priority: Critical
>             Fix For: 0.9.0
>
>         Attachments: BIGTOP-1677.1.patch
>
>
> The tez rpm can not be built. After some self hacks I finally figured out the 
> root cause:
> BIGTOP-1179 commit is weird. The commit message shows that it was [authored 
> on 27 Nov 
> 2014|https://github.com/apache/bigtop/commit/f506701c8e8cd1b9e596c3f728996c988705e7d0],
>  which should be an old patch targeted on 0.5.2 instead of the new one 
> authored by [~oflebbe]. The wired thing is that the tez version of that 
> commit is 0.6.0, which is new, but the code in that commit looked the same as 
> the old patch submitted on 27 Nov 2014.
> Anyhow, we need to sync up the code to the final reviewed version in 
> BIGTOP-1179.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to