Hi,

the latest fulltest on CI-Server went "pretty well" with just one single
test-failure [1] which IMHO 
is because that the delay by the second route there is "too" low causing the
"mock:bar" receive
more than 1 expected messages from time to time.

As I intend not to break anything :-) I attach a potential patch:

http://camel.465427.n5.nabble.com/file/n5165676/org.apache.camel.impl.PendingExchangesTwoRouteShutdownGracefulTest.testShutdownGraceful.patch
org.apache.camel.impl.PendingExchangesTwoRouteShutdownGracefulTest.testShutdownGraceful.patch
 

to this post for your consideration!

If this makes sense to you (I assume Claus is the best target to this
question) feel free to apply it
into the trunk or let me know if I should do that.

BTW the Jenkins "Age" of this test failure is "3".

[1]
https://builds.apache.org/job/Camel.trunk.fulltest/667/org.apache.camel$camel-core/testReport/

Babak

--
View this message in context: 
http://camel.465427.n5.nabble.com/FEEDBACK-Newest-Test-Failure-on-the-CI-Server-tp5165676p5165676.html
Sent from the Camel Development mailing list archive at Nabble.com.

Reply via email to