Hi Hadrian,

I will take a look also.

Regards
JB

On 03/01/2012 05:19 AM, Hadrian Zbarcea wrote:
First attempt to release camel-2.9.1 failed with an osgi related
problem. Will look into it in the morning and restart the builds.

Hadrian

On 02/28/2012 06:39 PM, Christian Müller wrote:
I fixed this for Camel 2.10.0. The fix is to late to go into Camel 2.9.1
because we should test it also with other JMS providers first.
I have no other issues which have to go into Camel 2.9.1.

Best,
Christian

On Mon, Feb 27, 2012 at 11:08 PM, Christian Müller<
christian.muel...@gmail.com> wrote:

If it's considered as bug or improvement, I would like to fix [1].
It's an
issue we hit last week in our development team and have to use a ugly
workaround...

[1]
http://camel.465427.n5.nabble.com/DefaultUnitOfWork-doesn-t-copy-headers-from-the-original-message-if-it-s-a-JmsMessage-td5518546.html


Best,
Christian


On Mon, Feb 27, 2012 at 6:20 PM, Hadrian
Zbarcea<hzbar...@gmail.com>wrote:

Thank Chris, looking into it.
Hadrian


On 02/27/2012 09:56 AM, chris snow wrote:

https://issues.apache.org/**jira/browse/CAMEL-5030<https://issues.apache.org/jira/browse/CAMEL-5030>would
be good :)

Although it's tagged as an improvement, the patch could be
considered a
fix
as the 2.9.0 version of smpp doesn't work in my environment due to its
lack
of proxy support.

On Mon, Feb 27, 2012 at 2:32 PM, Hadrian Zbarcea<hzbar...@gmail.com>
wrote:

Yeah, got busy with other things :(. I am looking at last small
fixes we
can do in 2.9.x and build the kits probably on Wed. The builds
were ok
last
week we should be in good shape. The jenkins builds only show one
failure
which I believe to be a test issue, but I'll look into it anyway.

If anybody has fixes they want in, please shout.

Cheers,
Hadrian

[1] http://s.apache.org/Rxp


On 02/25/2012 09:43 AM, Christian Müller wrote:

Hello Hadrian!

Do you have any updates for the Camel 2.9.1 release for us?

Best,
Christian

On Wed, Feb 8, 2012 at 3:24 PM, Hadrian Zbarcea<hzbar...@gmail.com>
wrote:

Hi Babak, most of those are assigned to me and is ongoing work.
Since

then
I discovered issues with uris in a few other components. My
intention
is
to
resolve as many as I can in 2.9.1. The idea is to pick up the low
hanging
fruits now and for the 3.0 release all camel uris to be proper
uris.

In addition to these issues I am sure others will be resolved as
well, so
I think the number of issues solved in 2.9.1 will be somewhere
between 80
and 100.

Cheers,
Hadrian


On 02/08/2012 09:04 AM, Babak Vahdat wrote:

Hi


Currently there're 17 open tickets most of them were postponed to
2.9.1
as
there was the intention to bring 2.9.0 out the door, mostly
regarding
the
proper URI format/usage stuff, etc.

Would be the idea to postpone these tickets again to another 2.9.x
release
or can it be managed to resolve them properly by this target
release?

Babak

--
View this message in context: http://camel.465427.n5.nabble.******
com/DISCUSS-Camel-2-9-1-******Release-tp5463566p5466569.****html<
http://camel.465427.n5.**nabbl**e.com/DISCUSS-Camel-2-9-**<http://nabble.com/DISCUSS-Camel-2-9-**>

1-Release-tp5463566p5466569.****html<http://camel.465427.n5.**
nabble.com/DISCUSS-Camel-2-9-**1-Release-tp5463566p5466569.**html<http://camel.465427.n5.nabble.com/DISCUSS-Camel-2-9-1-Release-tp5463566p5466569.html>




Sent from the Camel Development mailing list archive at
Nabble.com.


--
Hadrian Zbarcea
Principal Software Architect
Talend, Inc
http://coders.talend.com/
http://camelbot.blogspot.com/



--
Hadrian Zbarcea
Principal Software Architect
Talend, Inc
http://coders.talend.com/
http://camelbot.blogspot.com/



--
Hadrian Zbarcea
Principal Software Architect
Talend, Inc
http://coders.talend.com/
http://camelbot.blogspot.com/






--
Jean-Baptiste Onofré
jbono...@apache.org
http://blog.nanthrax.net
Talend - http://www.talend.com

Reply via email to