Hi I think it may be a good idea for us to do a RC2 before we do the 4.0 GA release.
There has been some changes to the build system of the main branch, and many dependency upgrades (and some still to do) in both maven plugins and for components. All together I think it would be good to give time for doing a RC2 that allows us to catch and find issues ahead of time. So what if we aim for RC2 by the end of this month. And then cut 4.0 GA later in August. However it depends on the availability of Gregor. We can surely adjust the schedule. But I think the GA should be aimed to be GA in September; otherwise we postpone the release too long. Any thoughts? -- Claus Ibsen ----------------- @davsclaus Camel in Action 2: https://www.manning.com/ibsen2