I agree with a unique number that Continuum can link to a revision or
a date, depending on the SCM capabilities. I'm thinking that the
Master should control time, so if a timestamp is required, it should
be obtained from the master server, so that all agents are synced up
with a single source of time.
Christian
On 26-Jan-09, at 19:46 , Brett Porter wrote:
ep, but something to bear in mind is that not all systems support an
atomic revision number (eg, CVS). Perhaps the date could be used in
its stead here - as long as it's used consistently (with no gaps in
time) it should be fine (though date is bad to use in subversion,
since it doesn't always work).
I was actually thinking we should create a separate record from the
checkout about what the last build was anyway (as this would support
the multiple build definitions as well). This might be a good
opportunity.
Christian E. Gruber - President / Senior Consultant
Isráfíl Consulting Services Corporation
email: [email protected]
mobile: +1 (289) 221-9839
web: http://www.israfil.net/
"...keenness of understanding is due to keenness of vision."