On 16/01/2010, at 9:15 AM, Wendy Smoak wrote: > To improve this, I think > - there should be a single place to configure the feature
+1 > - the user shouldn't have to create the queues, setting the number should do > it +1, though naming them is useful (using default names QUEUE_1, etc. to make it quick if desired). If they are at least in one place that should be ok. > - queues shouldn't belong to schedules (if queues are attached to > schedules, how do forced builds work?) It's at least the other way around (schedules assigned to queues, but they certainly don't "belong" to schedules). But overall, I thought everything was attached to build definitions, which seems the best place here again. > I'd like to get this into JIRA but I'm struggling with whether to > paste what I wrote above with a summary of "Parallel Build > configuration is not intuitive" or whether it needs to be broken up. Either way works, since the above are fairly discrete two related tickets is probably appropriate. - Brett -- Brett Porter [email protected] http://brettporter.wordpress.com/
