Josh Wills updated CRUNCH-237:
------------------------------

    Attachment: CRUNCH-237.patch

The patch. I will submit it in the next few minutes.
                
> Improper job dependencies for certain types of long pipelines
> -------------------------------------------------------------
>
>                 Key: CRUNCH-237
>                 URL: https://issues.apache.org/jira/browse/CRUNCH-237
>             Project: Crunch
>          Issue Type: Bug
>          Components: Core
>    Affects Versions: 0.6.0
>            Reporter: Josh Wills
>            Assignee: Josh Wills
>             Fix For: 0.7.0
>
>         Attachments: CRUNCH-237.patch
>
>
> The Crunch planner analyzes the dependencies between different phases of a 
> MapReduce pipeline and uses those dependencies to ensure that the MapReduce 
> jobs in the pipeline are executed in the correct sequence. For certain kinds 
> of long pipelines, it's possible for the planner to miss a necessary 
> dependency as follows:
> Pipeline spec: [Input] -> GBK -> [Out1] -> (GBK) -> (Out2) -> GBK -> [Out3]
> This pipeline has two explicit outputs (Out1 and Out3) and one implicit 
> output (Out2). Additionally, assume that there is a map-side join between 
> Out1 that happens in the map stage of the job that creates Out2. For this 
> pipeline, the planner will mark a dependency between the job that creates 
> Out1 and the job that creates Out3, but NOT between the job that creates Out1 
> and the job that creates Out2. This makes it possible for the Out2 job to run 
> before Out1 is created, causing a failure.
> The easiest way to fix this I could see was to add a step to the dependency 
> chain such that every job that is created in a later stage of pipeline 
> creation depends on all of the jobs in the earlier stages having been run, 
> which is what the attached patch and example integration test demonstrate.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to