Vira Vitanska created DLAB-104:
----------------------------------
Summary: [Scheduler on idle]: Ability to configure scheduler for
resources stopping/termination on exceeding idle time
Key: DLAB-104
URL: https://issues.apache.org/jira/browse/DLAB-104
Project: Apache DLab
Issue Type: Improvement
Reporter: Vira Vitanska
As a user I want to have a scheduler for Clusters to be stopped (Spark) or
terminated (EMR) after XXX minutes of inactivity, so that I can reduce charges
during non-working period with computational resources.
*Acceptance criteria:*
*1.* it should be default option
*2.* radio button should be on scheduler dialog which has this option checked
and set to 120 minutes
*2.1.* in case it was configured to 120 min and on 119 minute some
activity started we do not stop/terminate anything. BUT postpone
stopping/termination for next 120 min
*3.* it should NOT be two schedulers at the same time (it should be configured
by pattern and inactivity one)
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]