[
https://issues.apache.org/jira/browse/DLAB-112?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Vira Vitanska updated DLAB-112:
-------------------------------
Fix Version/s: (was: 1.0 release)
> [Scheduler on idle]: Ability to configure scheduler for resources
> stopping/termination on exceeding idle time
> -------------------------------------------------------------------------------------------------------------
>
> Key: DLAB-112
> URL: https://issues.apache.org/jira/browse/DLAB-112
> Project: Apache DLab
> Issue Type: Improvement
> Reporter: Vira Vitanska
> Assignee: Bohdan Hliva
> Priority: Major
>
> As a user I want to have a scheduler for Clusters to be stopped (Spark) or
> terminated (EMR) after XXX minutes of inactivity, so that I can reduce
> charges during non-working period with computational resources.
>
> *Acceptance criteria:*
> *1.* it should be default option
> *2.* radio button should be on scheduler dialog which has this option checked
> and set to 120 minutes
> *2.1.* in case it was configured to 120 min and on 119 minute some
> activity started we do not stop/terminate anything. BUT postpone
> stopping/termination for next 120 min
> *3.* it should NOT be two schedulers at the same time (it should be
> configured by pattern and inactivity one)
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]