Kunal Khatua created DRILL-2989:
-----------------------------------
Summary: TPCDS Query corrupts Drillbits and causing subsequent
unrelated queries to hang (and timeout)
Key: DRILL-2989
URL: https://issues.apache.org/jira/browse/DRILL-2989
Project: Apache Drill
Issue Type: Bug
Affects Versions: 1.0.0
Environment: RHEL 6.4
Reporter: Kunal Khatua
Priority: Critical
Fix For: 1.0.0
30-node setup has TPC-H Drill (SF100) and TPC-DS Drill (SF100) in two different
workspaces.
TPC-H Query 6 is executed on the cluster successfully, followed by execution of
TPC-DS Query 2; which hangs during the executeQuery() operation. After a 2min
timeout, the TPC-H Query is executed on the cluster, but this also hangs during
the fetching of rows from the ResultSet. The profile page for the second
attempt at TPC-H query 6 shows it as pending.
The TPC-H schema is in its own workspace which exposes the directories as
tables.
The TPC-DS schema is in its own workspace, which has views on top of the
directories containing the actual tables' data.
====TPCH-06====
[INFO] Will be using Drillbit on 10.10.120.114
[QUERYID] 2ab41296-1420-ee4b-2617-849b63eb11b4
[STAT] TOTAL TIME : 7420 msec
====TPCDS-02====
[INFO] Will be using Drillbit on 10.10.120.117
[TIME OUT] Query took more than 120 sec.
====TPCH-06====
[INFO] Will be using Drillbit on 10.10.120.130
[TIME OUT] Query took more than 120 sec.
[QUERYID] 2ab41027-abcc-c48a-7e3c-957bb069f452
[STAT] TOTAL TIME : 120017 msec
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)