Sowmya Ramesh created FALCON-1174:
-------------------------------------

             Summary: Ability to disable oozie dryrun while scheduling or 
updating the falcon process
                 Key: FALCON-1174
                 URL: https://issues.apache.org/jira/browse/FALCON-1174
             Project: Falcon
          Issue Type: Improvement
          Components: oozie
    Affects Versions: 0.6
            Reporter: Sowmya Ramesh
            Assignee: Sowmya Ramesh
             Fix For: 0.7


Today, before scheduling or updating an entity Oozie dry run is done to 
validate it. This validation helps as Oozie dry run is s a sync operation and 
hence validation can be done before scheduling the job.

There may be a requirement where user would want to turn off this feature. 
Improvement is to provide a config knob to skip the dry run.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to