Hi, a full mvn install takes about 2-2.5 hours. Does the Flink team run the full testsuite on every dev pull request, or use a main dev branch that gets the full test periodically? Or a different method? The 2 hours can be a drag when one team needs another's changes and each attempt at passing requires a wait of 2+ hours.
- build/devops cw7k
- Re: build/devops Chesnay Schepler
- Re: build/devops Fabian Hueske
