Matthias Pohl created FLINK-33276:
-------------------------------------
Summary: Reorganize CI stages
Key: FLINK-33276
URL: https://issues.apache.org/jira/browse/FLINK-33276
Project: Flink
Issue Type: Technical Debt
Components: Build System / CI
Affects Versions: 1.17.1, 1.16.2, 1.18.0, 1.19.0
Reporter: Matthias Pohl
{{connect_2}} stage became obsolete due to the externalization of the
connectors. We can merge {{connect_1}} and {{connect_2}} again into a single
{{connect}} stage (and maybe rename it into something more meaningful?)
--
This message was sent by Atlassian Jira
(v8.20.10#820010)