Rui Fan created FLINK-33999: ------------------------------- Summary: FLIP-412: Add the time-consuming span of each stage when starting the Flink job to TraceReporter Key: FLINK-33999 URL: https://issues.apache.org/jira/browse/FLINK-33999 Project: Flink Issue Type: New Feature Components: Runtime / Coordination, Runtime / Metrics Reporter: Rui Fan Assignee: junzhong qin
-- This message was sent by Atlassian Jira (v8.20.10#820010)