Gustavo de Morais created FLINK-41709:
-----------------------------------------

             Summary: Merge consecutive Calcs after changelog mode inference
                 Key: FLINK-41709
                 URL: https://issues.apache.org/jira/browse/FLINK-41709
             Project: Flink
          Issue Type: Improvement
          Components: Table SQL / Planner
            Reporter: Gustavo de Morais
            Assignee: Gustavo de Morais


After changelog mode inference, two {{Calc}} nodes can end up directly on top 
of each other, for example when a filter that was pushed into a removed 
{{ChangelogNormalize}} is kept as its own {{Calc}} below a projection. The same 
happens in other plans as well. Two consecutive Calcs add no value and cost an 
extra operator per row.

We should merge consecutive {{Calc}} nodes after changelog mode inference, as 
the planner already does before it, while keeping the changelog traits of the 
merged node correct.



--
This message was sent by Atlassian Jira
(v10.3.26#10030026)

Reply via email to