+1

On Tue, Mar 23, 2010 at 6:47 AM, Eric Lemoine
<[email protected]>wrote:

> Hi
>
> With all the "milestone 0.7" tickets now closed, I'd like to start the
> release procedure (as documented in [*]).
>
> Are PSC members ok with that? Please vote. As always everyone is
> invited to give opinion.
>
> As discussed during the last IRC meeting GeoExt 0.7 will be released
> after OpenLayers 2.9. In the mean time GeoExt 0.7 release candidates
> will be done.
>
> Thanks,
>
> [*] <http://trac.geoext.org/wiki/Release/Procedure>
>
> --
> Eric Lemoine
>
> Camptocamp France SAS
> Savoie Technolac, BP 352
> 73377 Le Bourget du Lac, Cedex
>
> Tel : 00 33 4 79 44 44 96
> Mail : [email protected]
> http://www.camptocamp.com
> _______________________________________________
> Dev mailing list
> [email protected]
> http://www.geoext.org/cgi-bin/mailman/listinfo/dev
>



-- 
Geospatial Director Camptocamp SA
Cédric Moullet
PSE A
CH-1015 Lausanne
www.camptocamp.com  / www.mapfish.org / twitter.com/cedricmoullet /
mapfishblog.blogspot.com/

+41 79 759 69 83 (mobile)
+41 21 619 10 21 (direct)
+41 21 619 10 10 (centrale)
+41 21 619 10 00 (fax)
_______________________________________________
Dev mailing list
[email protected]
http://www.geoext.org/cgi-bin/mailman/listinfo/dev

Reply via email to