TranQL has three components. The Connectors (1.2-SNAPSHOT), the
persistence engine (1.3-SNAPSHOT) and the vendors rars (various
versions depending on the rar in question).
Does that answer your question ?
Matt,
You have them both listed as "tranql_version". I think you mean:
tranql_version=1.3-SNAPSHOT
tranql_connector_version=1.2-SNAPSHOT
--kevan
Matt
Jason Dillon wrote:
Why 2 versions of TranQL?
--jason
On 5/31/06, Matt Hogstrom <[EMAIL PROTECTED]> wrote:
Here are the outstanding issues and my proposed plans to finish
1.1.
Currently there are 124 JIRAs out there for 1.1. There are also
7 or 8 blockers. I have not seen
any activity on these items in the last week so I'm assuming
that there is no resource to fix them.
I propose that tomorrow I'll move the JIRA's in 1.1 to 1.2 and
for those items that are considered
hot and people want to work on them they can move them to the
1.1.1 release. I'll do this through a
bulk change.
The remaining items are:
Convert remaining SNAPSHOTs to releases. Here is the remaining
list of items:
activemq_version=3.2.4-SNAPSHOT
geronimo_version=1.1-SNAPSHOT
openejb_version=2.1-SNAPSHOT
tranql_version=1.2-SNAPSHOT
tranql_version=1.3-SNAPSHOT
geronimo_spec_corba_version=1.0-SNAPSHOT
geronimo_spec_j2ee_version=1.1-SNAPSHOT
geronimo_spec_javamail_version=1.1-SNAPSHOT
geronimo_spec_jcache_version=1.1-SNAPSHOT
daytrader_version=1.1-SNAPSHOT
I will convert DayTrader and TranQL after the final set of
stress testing.
Any volunteers to convert the specs? (Alan :)
Kevan, we'll need you to sign off on the activemq versions.
When the above is complete I suggest we get a final test from
Kevan and cut a proposed 1.1 for Friday.
If that's good (or if there are only minor fixes) we'll push 1.1
out next week and then move on to
1.2 and beyond.
Thoughts?