Pavan Kumar created GIRAPH-917:
----------------------------------
Summary: Every commit is followed by ABORTED: Integrated in
Giraph-trunk-Commit
Key: GIRAPH-917
URL: https://issues.apache.org/jira/browse/GIRAPH-917
Project: Giraph
Issue Type: Task
Reporter: Pavan Kumar
Currently, every continuous build is aborted, because it is taking too long.
Shouldn't we reduce the testing time so we can be with in the time limit or
have a way to increase the time limits.
Would be great if some one from PMC can take a look. This issue has been
bugging us for very long now. Continuous build has become useless in verifying
correctness of commit because of this issue.
Thanks.
--
This message was sent by Atlassian JIRA
(v6.2#6252)